Safety is an ongoing process

Trainsets have been built at Bombardier in Bruges for many years. Before these carriages can enter the international rail network, they must first undergo various functional and electrical tests. High voltage is connected in the test bays, making safety paramount in the installation. Pilz developed a safety plan for the test bays at Bombardier, enabling employees to test the trainsets safely. The installation is based on a PSS 4000 safety PLC.

At the heart of the safety installation is Pilz’s PSS 4000 safety PLC, which processes all the I/Os.
Facility manager Marc Wuidart, who has worked at Bombardier for 34 years, explains the tests that a modern trainset has to undergo: “Completed carriages are moved by rail into the test bay, where we begin with the electrical checks. Literally every wire is tested. It’s a substantial job, as a single carriage has more than 5,000 connection points. In the first bay, we test the quality of the wiring and use dielectric tests to check that the insulation is sound. The carriage then moves to another test bay, where we carry out functional tests from A to Z. These range from safety tests, such as checking the air lines for leaks and conducting pneumatic brake tests, to tests of the climate control and heating systems. We also check the converter that steps the voltage down from high voltage to 220 and 380 V. The presence of high voltage calls for a specific approach, particularly as a few years ago there was an accident at the company involving 3 kV high voltage. Fortunately, it was not fatal.”

To ensure safety, Pilz developed a safety plan involving several safety I/Os, including badge-controlled access.
Working with SPIE
Bombardier has an in-house technical department responsible for keeping all its machines operational. For the installation of new systems, however, the train builder calls on SPIE, a major player in the Belgian installation market with 1,800 employees. SPIE site manager Hans Soulliaert explains: “For this project, we were asked to oversee the technical implementation of the test bays. Our speciality is implementing the mechanical and electrical aspects of the installation, but we called on Pilz’s expertise for the safety side. They carried out all the calculations, programming and validation, and developed the concept. They are highly skilled in that niche, just as we are in ours. This symbiosis results in an installation where safety is several steps ahead. It was also an advantage that the three parties had worked together before, as Pilz had already been involved in previous projects at Bombardier.”

A clear visualisation gives employees an immediate overview of the situation and enables rapid diagnosis.
A carefully designed safety cycle
Kwinten Cantraine, sales manager at Pilz, explains the steps involved in the safety study: “We always follow a complete safety cycle. The first and mandatory step is the risk assessment. Next, in the safety concept, we work with Bombardier to find practical, compliant solutions to reduce the risks.

When the coded Pilz safety switches (PSENcode) are activated, the power in the test bay is cut immediately.